Advanced Customization for MNC's Leave Maintenance in jsp
Advanced Customization for MNC's Leave Maintenance in jsp
PROJECT ID: JSP18
PROJECT
NAME: Advanced
Customization for MNC's Leave Maintenance
PROJECT CATEGORY: MCA / BCA / BCCA / MCM / POLY / ENGINEERING
PROJECT ABSTRACT:
The Leave Management System is an Lan based or online application which can be used throughout the corporate organization . This project system can be used to automate the workflow of leave applications and their approvals in corporate world. This system have features like notification of email, leave cancellation, automated leave approval and report generation based on the requested data by the user.
The system is designed to be having the idea of distributed model, with centralized storage of the database used in the system. Using some basic constructs of MS-SQL Server and some UI have been designed using the ASP.Net technology. Connectivity of database is designed using the “SQL Connection” system. The security standards and data protection process have be given much importance to make application more secure.
Technologies Used
1. Java
2. SQL
3. JSP
4. JavaScript
5. Ajax
SOFTWARE REQUIREMENTS:
1. Oracle
2. Jdk
3. Eclipse
4. Netbeans
5. notepad
HARDWARE REQUIREMENTS:
1. Hard Disk – 2 GB.
2. RAM – 1 GB.
3. Processor – Dual Core or Above.
4. Mouse.
5. Keyboard.
6. Monitor.
7. Printer.
TABLE OF CONTENTS
·
Title
Page
·
Declaration
·
Certification
Page
·
Dedication
·
Acknowledgements
·
Table of
Contents
·
List of
Tables
·
Abstract
CHAPTER SCHEME
CHAPTER ONE: INTRODUCTION
CHAPTER TWO: OBJECTIVES
CHAPTER THREE: PRELIMINARY
SYSTEM ANALYSIS
·
Preliminary Investigation
·
Present System in Use
·
Flaws In Present System
·
Need Of New System
·
Feasibility Study
·
Project Category
CHAPTER FOUR: SOFTWARE
ENGINEERING AND PARADIGM APPLIED
·
Modules
·
System / Module Chart
CHAPTER FIVE: SOFTWARE AND
HARDWARE REQUIREMENT
CHAPTER SIX: DETAIL SYSTEM
ANALYSIS
·
Data Flow Diagram
·
Number of modules and
Process Logic
·
Data Structures and Tables
·
Entity- Relationship
Diagram
·
System Design
·
Form Design
·
Source Code
·
Input Screen and Output
Screen
CHAPTER SEVEN:
TESTING
AND VALIDATION CHECK
CHAPTER EIGHT:
SYSTEM SECURITY MEASURES
CHAPTER NINE:
IMPLEMENTATION, EVALUATION &
MAINTENANCE
CHAPTER TEN:
FUTURE SCOPE OF THE PROJECT
CHAPTER ELEVEN:
SUGGESTION AND CONCLUSION
CHAPTER TWELE: BIBLIOGRAPHY& REFERENCES
Other
Information
PROJECT
SOFWARE |
ZIP |
PROJECT REPORT PAGE |
60
-80 Pages |
CAN BE USED IN |
Marketing
(MBA) |
PROJECT COST |
1500/-
Only |
PDF SYNOPSIS COST |
250/-
Only |
PPT PROJECT COST |
300/-
Only |
PROJECT WITH SPIRAL BINDING |
1750/-
Only |
PROJECT WITH HARD BINDING |
1850/-
Only |
TOTAL
COST (SYNOPSIS, SOFTCOPY, HARDBOOK, and SOFTWARE, PPT) |
2500/-
Only |
DELIVERY TIME |
1
OR 2 Days (In
case Urgent Call: 8830288685) |
SUPPORT / QUERY |
|
CALL |
8830288685 |
|
help@projectsready.in |
[Note:
We Provide Hard Binding and Spiral Binding only Nagpur Region] |
Comments
Post a Comment
If you have any doubt let me know