Connect Globe in jsp

 

Connect Globe in jsp

 

 PROJECT ID: JSP03

 

PROJECT NAME: Connect Globe in jsp

 

PROJECT CATEGORY: MCA / BCA / BCCA / MCM / POLY / ENGINEERING

 

PROJECT ABSTRACT:

Connect Globe provides a common platform where common people can share their experiences, information and hurdles all over the globe and people can consult and discuss on any topic that is created by only the registered user. Moreover the user can give their precious advice on any topic or report. Admin and common people can used this application.

The admin after being logged in can create and also post any topic or report that is to be discussed. Admin can also control the posts and the proceeding of the reports. Admin also can view old comment history and post his own comment on topics. Common people can view reports after being logged in and can share the reports and also post and view comments. Any kind of can be used by you for the creation of the project. You can choose among any kinds of IDE including Eclipse, Myeclipse and Net beans or any other such software tools available. Oracle 10g is used as the database for the development of the project and as server, Apache tomcat, Glass fish, WebSphere etc. any can be used. The back end tools necessary for this project are JDBC, JSP, AJAX and JAVA script while the back end key is the Oracle software.

After importing the files on the IDE, all the tables associated with the program will be created automatically.

 

Existing System

In the recent time, there is no useful platform or any single platform where people can share their feelings, their views, their platforms and can discuss each and everything with the other people. Existing Connect Globe system needs a lot of efforts and needs a platform for the people where they can while sitting at their own home, can discuss things across with anyone using the internet and pc connection only.

Proposed System

Proposed Connect Globe system is totally worked towards providing a platform for the people who wish to connect and discuss things with other people as well. Proposed Connect Globe system is highly automated and worked towards the well being of the people. People just need to post each and everything and they can connect via this application with any one across the globe.

 

Connect Globe Modules

Administrative module: The administrative module gives exclusive rights to the admin to post particular topics or reports that is to be discussed after getting logged in properly. The security measures are also given an utmost priority in this module and the user’s important and confidential data are protected in right manner. The admin can also control the posts as well as the proceedings of the reports. The admin module also has the rights to view and modify old comment history, delete inappropriate comments and post own comments on the topics.

 

Users Module: The module allows the users to get logged into the system and view posts or reports that they wish to. The users can share the posts or reports, post any contents and also view other people’s comments.

Technologies Used

1.      Java

2.      SQL

3.      JSP

4.      JavaScript

5.      Ajax

SOFTWARE REQUIREMENTS:

1.      Oracle

2.      Jdk

3.      Eclipse

4.      Netbeans

5.      notepad

HARDWARE REQUIREMENTS:

1.      Hard Disk – 2 GB.

2.      RAM – 1 GB.

3.      Processor – Dual Core or Above.

4.      Mouse.

5.      Keyboard.

6.      Monitor.

7.      Printer.

 

TABLE OF CONTENTS

·        Title Page      

·        Declaration

·        Certification Page

·        Dedication

·        Acknowledgements

·        Table of Contents

·        List of Tables

·        Abstract

 

CHAPTER SCHEME

CHAPTER ONE: INTRODUCTION

CHAPTER TWO: OBJECTIVES

CHAPTER THREE: PRELIMINARY SYSTEM ANALYSIS

·         Preliminary Investigation

·         Present System in Use

·         Flaws In Present System

·         Need Of New System

·         Feasibility Study

·         Project  Category

CHAPTER FOUR: SOFTWARE ENGINEERING AND PARADIGM APPLIED   

·         Modules

·         System / Module Chart

CHAPTER FIVE: SOFTWARE AND HARDWARE REQUIREMENT

CHAPTER SIX: DETAIL SYSTEM ANALYSIS

·         Data Flow Diagram

·         Number of modules and Process Logic

·         Data Structures  and Tables

·         Entity- Relationship Diagram

·         System Design

·         Form Design 

·         Source Code

·         Input Screen and Output Screen

CHAPTER SEVEN: TESTING AND VALIDATION CHECK

CHAPTER EIGHT: SYSTEM SECURITY MEASURES

CHAPTER NINE: IMPLEMENTATION, EVALUATION & MAINTENANCE

CHAPTER TEN: FUTURE SCOPE OF THE PROJECT

CHAPTER ELEVEN: SUGGESTION AND CONCLUSION

CHAPTER TWELE: BIBLIOGRAPHY& REFERENCES          

Other Information

 

PROJECT SOFWARE

ZIP

PROJECT REPORT PAGE

60 -80 Pages

CAN BE USED IN

Marketing (MBA)

PROJECT COST

1500/- Only

PDF SYNOPSIS COST

250/- Only

PPT PROJECT COST

300/- Only

PROJECT WITH SPIRAL BINDING

1750/- Only

PROJECT WITH HARD BINDING

1850/- Only

TOTAL COST

(SYNOPSIS, SOFTCOPY, HARDBOOK, and SOFTWARE, PPT)

2500/- Only

DELIVERY TIME

1 OR 2 Days

(In case Urgent Call: 8830288685)

SUPPORT / QUERY

www.projectsready.in

CALL

8830288685

Email

help@projectsready.in

[Note: We Provide Hard Binding and Spiral Binding only Nagpur Region]

Download

 

Comments

Popular posts from this blog

Online Salon & Spa Booking System

Fake Review Identification in php

Clothes Recommendation System project in php