Online Leave Management System for MNCs in php
Online Leave Management System for MNCs in php
PROJECT ID: PHP14
PROJECT
NAME: Online
Leave Management System for MNCs
PROJECT CATEGORY: MCA / BCA / BCCA / MCM / POLY / ENGINEERING
PROJECT ABSTRACT:
This task is gone for building up an online leave administration framework that is of significance to either an association. The Leave Management System (LMS) is an Intranet based application that can be gotten to all through the association or a predetermined gathering/Dept. This framework can be utilized to computerize the work process of leave applications and their endorsements. The occasional crediting of leave is likewise robotized. There are highlights like email warnings, programmed endorsement of leave, report generators and so forth in this framework. Leave Management application will lessen paperwork and keeps up the record in a more proficient way.
EXISTING SYSTEM
In the existing framework, each school takes after the manual system in which workforce ought to enter in time and out time in a record book. Toward the finish of every month, Head of the office will figure leaves of each employee which is a period taking procedure and there are risks of losing records.
PROPOSED SYSTEM
In proposed framework odds of losing information isn’t conceivable in light of the fact that information is kept up as a database. Consistently participation, leaves and notification data is refreshed into database utilizing an easy to understand GUI. This will lessen work for Head of divisions. This application is an online application which makes more adaptable to get to data.
Number of Modules
After watchful examination the framework has been recognized to have the accompanying modules:
1. Admin Module
2. Employee Module
3. Hod Module
4. Principal Module
SOFTWARE REQUIREMENTS:
· Front End – PHP
· Back End – MySQL 5.0
· Server – Apache Server 2.0
· Design Tool – Macromedia Dreamweaver 8.0
·
Documentation Tools – Microsoft Word
HARDWARE REQUIREMENTS:
· 233 MHz processor.
· 128 MB SD-RAM
· 2 – 4 GB Hard-Disk.
· 4x Compact Disk drive or quicker.
· 1.44 MB Floppy Disk Drive.
·
Monitor. [ 640 x 480 Display
TABLE OF CONTENTS
·
Title
Page
·
Declaration
·
Certification
Page
·
Dedication
·
Acknowledgements
·
Table of
Contents
·
List of
Tables
·
Abstract
CHAPTER SCHEME
CHAPTER ONE: INTRODUCTION
CHAPTER TWO: OBJECTIVES
CHAPTER THREE: PRELIMINARY
SYSTEM ANALYSIS
·
Preliminary
Investigation
·
Present System in Use
·
Flaws In Present System
·
Need Of New System
·
Feasibility Study
·
Project Category
CHAPTER FOUR: SOFTWARE
ENGINEERING AND PARADIGM APPLIED
·
Modules
·
System / Module Chart
CHAPTER FIVE: SOFTWARE AND
HARDWARE REQUIREMENT
CHAPTER SIX: DETAIL SYSTEM
ANALYSIS
·
Data Flow Diagram
·
Number of modules and
Process Logic
·
Data Structures and Tables
·
Entity- Relationship
Diagram
·
System Design
·
Form Design
·
Source Code
·
Input Screen and Output
Screen
CHAPTER SEVEN:
TESTING
AND VALIDATION CHECK
CHAPTER EIGHT:
SYSTEM SECURITY MEASURES
CHAPTER NINE:
IMPLEMENTATION, EVALUATION &
MAINTENANCE
CHAPTER TEN:
FUTURE SCOPE OF THE PROJECT
CHAPTER ELEVEN:
SUGGESTION AND CONCLUSION
CHAPTER TWELE: BIBLIOGRAPHY& REFERENCES
Other
Information
PROJECT
SOFWARE |
ZIP |
PROJECT REPORT PAGE |
60
-80 Pages |
CAN BE USED IN |
Marketing
(MBA) |
PROJECT COST |
1500/-
Only |
PDF SYNOPSIS COST |
250/-
Only |
PPT PROJECT COST |
300/-
Only |
PROJECT WITH SPIRAL BINDING |
1750/-
Only |
PROJECT WITH HARD BINDING |
1850/-
Only |
TOTAL
COST (SYNOPSIS, SOFTCOPY, HARDBOOK, and SOFTWARE, PPT) |
2500/-
Only |
DELIVERY TIME |
1
OR 2 Days (In
case Urgent Call: 8830288685) |
SUPPORT / QUERY |
|
CALL |
8830288685 |
|
help@projectsready.in |
[Note:
We Provide Hard Binding and Spiral Binding only Nagpur Region] |
Comments
Post a Comment
If you have any doubt let me know