Virtual private network in java
Virtual private network
PROJECT ID: JAVA17
PROJECT NAME: Virtual private network
PROJECT CATEGORY: MCA / BCA / BCCA / MCM / POLY / ENGINEERING
PROJECT ABSTRACT:
Virtual Private Network is a networking application developed in Java as a final year project. It aims at the extension of private network across a public one such as the internet. Virtual Private Network (VPN) is developed by setting up point-to-point virtual connection through traffic encryption, dedicated connections or virtual tunneling protocols. This project helps to develop the same connection across internet as a Wide Area Network (WAN) link between websites.
Modules Overview:
1. Virtual Private Network can be considered as three modules project: administration module, marketing module and training module. The administration module has been defined to monitor office and staff details. The major duties of administration module are to take staff attendance, add clients, train the projects, add course details, etc.
2. Marketing module is designed to maintain the marketing part of the software. The last module or training module is made to take care of technical sector such as software testing, networking, call center and J2EE training. Each of these three modules is interconnected and there must be a fast and efficient link between all the modules.
SOFTWARE REQUIREMENTS:
FRONT END: HTML, JAVA
SCRIPT
Technologies: CORE
JAVA
DATABASE: SQL
Operating System:
Windows XP/7/8/10
HARDWARE REQUIREMENTS:
Processor: Intel
Pentium based system
Processor speed:
250 MHz to 833MHz
RAM SPEED: 1GB
TABLE OF CONTENTS
·
Title
Page
·
Declaration
·
Certification
Page
·
Dedication
·
Acknowledgements
·
Table of
Contents
·
List of
Tables
·
Abstract
CHAPTER SCHEME
CHAPTER ONE: INTRODUCTION
CHAPTER TWO: OBJECTIVES
CHAPTER THREE: PRELIMINARY SYSTEM ANALYSIS
·
Preliminary Investigation
·
Present System in Use
·
Flaws In Present System
·
Need Of New System
·
Feasibility Study
·
Project
Category
CHAPTER FOUR: SOFTWARE ENGINEERING AND PARADIGM APPLIED
·
Modules
·
System / Module Chart
CHAPTER FIVE: SOFTWARE
AND HARDWARE REQUIREMENT
CHAPTER SIX: DETAIL
SYSTEM ANALYSIS
·
Data Flow Diagram
·
Number of modules and Process Logic
·
Data Structures and Tables
·
Entity- Relationship Diagram
·
System Design
·
Form Design
·
Source Code
·
Input Screen and Output Screen
CHAPTER SEVEN: TESTING AND VALIDATION CHECK
CHAPTER EIGHT:
SYSTEM SECURITY MEASURES
CHAPTER NINE:
IMPLEMENTATION, EVALUATION &
MAINTENANCE
CHAPTER TEN:
FUTURE SCOPE OF THE PROJECT
CHAPTER ELEVEN:
SUGGESTION AND CONCLUSION
CHAPTER TWELE: BIBLIOGRAPHY& REFERENCES
Other
Information
PROJECT
SOFWARE |
ZIP |
PROJECT REPORT PAGE |
60
-80 Pages |
CAN BE USED IN |
Marketing
(MBA) |
PROJECT COST |
1500/-
Only |
PDF SYNOPSIS COST |
250/-
Only |
PPT PROJECT COST |
300/-
Only |
PROJECT WITH SPIRAL BINDING |
1750/-
Only |
PROJECT WITH HARD BINDING |
1850/-
Only |
TOTAL
COST (SYNOPSIS, SOFTCOPY, HARDBOOK, and SOFTWARE, PPT) |
2500/-
Only |
DELIVERY TIME |
1
OR 2 Days (In
case Urgent Call: 8830288685) |
SUPPORT / QUERY |
|
CALL |
8830288685 |
|
help@projectsready.in |
[Note:
We Provide Hard Binding and Spiral Binding only Nagpur Region] |
Comments
Post a Comment
If you have any doubt let me know