AUTOMOBILE UTILIZATION In VB.NET

 

AUTOMOBILE UTILIZATION

 

 PROJECT ID: VBNET02

 

PROJECT NAME: AUTOMOBILE UTILIZATION

 

PROJECT CATEGORY: MCA / BCA / BCCA / MCM / POLY / ENGINEERING

 

PROJECT ABSTRACT:

The CSE students who are interested in doing the project on visual basics they can select Automobile Utilization visual basic project. Automobile system deals with the purchase and sales of the good and maintains the stock. It contains various forms and reports with different function. It has the menus created for different forms and reports.

 

The main objectives of Automobile system are:–

1.      Easy to generate report for any transaction.

2.      It is very much faster and flexible than manual system.

3.      Easy and fastest   record finding technique.

4.      Man power required is very less.

Data can be stored for a longer record.

Visual Basic syntax ideally suited for producing windows application. Ms Word, Ms Access and Ms PowerPoint all share Visual Basic for application, the exact same language syntax in Visual Basic-6.0. It continues the tradition of simple, powerful and easy to learn a language yet adds enough extended capabilities to satisfy the most jaded developer.

 

 

 

A database is coherent collection of data with some inherent meaning, built and populated with data for a specific purpose. Database stores data that is useful to us. This data is only a part of entire data available in the world around us.

SOFTWARE REQUIREMENTS:

FRONT END: VB..NET,

DATABASE: SQL Server, IIS

Operating System: Windows XP/7/8/10

HARDWARE REQUIREMENTS:

Processor: Intel Pentium based system 

Processor speed:  250 MHz to 833MHz 

RAM SPEED:  1GB 

 

TABLE OF CONTENTS

·        Title Page      

·        Declaration

·        Certification Page

·        Dedication

·        Acknowledgements

·        Table of Contents

·        List of Tables

·        Abstract

 

CHAPTER SCHEME

CHAPTER ONE: INTRODUCTION

CHAPTER TWO: OBJECTIVES

CHAPTER THREE: PRELIMINARY SYSTEM ANALYSIS

·        Preliminary Investigation

·        Present System in Use

·        Flaws In Present System

·        Need Of New System

·        Feasibility Study

·        Project  Category

CHAPTER FOUR: SOFTWARE ENGINEERING AND PARADIGM APPLIED   

·        Modules

·        System / Module Chart

CHAPTER FIVE: SOFTWARE AND HARDWARE REQUIREMENT

CHAPTER SIX: DETAIL SYSTEM ANALYSIS

·        Data Flow Diagram

·        Number of modules and Process Logic

·        Data Structures  and Tables

·        Entity- Relationship Diagram

·        System Design

·        Form Design 

·        Source Code

·        Input Screen and Output Screen

CHAPTER SEVEN: TESTING AND VALIDATION CHECK

CHAPTER EIGHT: SYSTEM SECURITY MEASURES

CHAPTER NINE: IMPLEMENTATION, EVALUATION & MAINTENANCE

CHAPTER TEN: FUTURE SCOPE OF THE PROJECT

CHAPTER ELEVEN: SUGGESTION AND CONCLUSION

CHAPTER TWELE: BIBLIOGRAPHY& REFERENCES          

Other Information

 

PROJECT SOFWARE

ZIP

PROJECT REPORT PAGE

60 -80 Pages

CAN BE USED IN

Marketing (MBA)

PROJECT COST

1500/- Only

PDF SYNOPSIS COST

250/- Only

PPT PROJECT COST

300/- Only

PROJECT WITH SPIRAL BINDING

1750/- Only

PROJECT WITH HARD BINDING

1850/- Only

TOTAL COST

(SYNOPSIS, SOFTCOPY, HARDBOOK, and SOFTWARE, PPT)

2500/- Only

DELIVERY TIME

1 OR 2 Days

(In case Urgent Call: 8830288685)

SUPPORT / QUERY

www.projectsready.in

CALL

8830288685

Email

help@projectsready.in

[Note: We Provide Hard Binding and Spiral Binding only Nagpur Region]

Download

 

Comments

Popular posts from this blog

Online Salon & Spa Booking System

Fake Review Identification in php

Clothes Recommendation System project in php