Budget Analysis System
BUDGET ANALYSIS System ASP.Net
Project
PROJECT ID: ASPNET34
PROJECT NAME: BUDGET ANALYSIS System ASP.Net Project
PROJECT CATEGORY: MCA / BCA / BCCA / MCM / POLY / ENGINEERING
PROJECT ABSTRACT:
The aim of this Budget Analysis System project is to build an application that will help in parsing financial data and making the calculations required for business firms. This application will automate the process and make it easier to collate information submitted by different managers. The system will utilize a Relational Database Management System (RDBMS) which will enable faster access and manipulation of data.
Businesses are required to keep track of their budget expenditures so as to avoid cost overruns and to ensure fiscal responsibility of managers. This application will be web based so as to enable managers from different parts of the globe to upload the required excel sheets. The data from the excel sheet will be automatically assimilated and the necessary calculations made to produce the information required by upper level management. A new project can be created by a manager or supervisor on the system and this will generate an excel sheet, with built in lookup function to avoid redundancies in data entry, that has to be filled out by the person in – charge.
The Budget Analysis System application will take all the data generated and analyse it to present trends and key statistics. The statistics generated can be viewed by upper management in the form of graphical representations such as graphs or pie charts, enabling quick understanding of the fiscal strength of the different departments of the business.
Existing System
The existing Budget Analysis System consists of excel sheets generated by different managers which are sent to one supervisor. The supervisor will have to individually go through each excel sheet to collect the information to make a unified financial record. These excel sheets are built as non-relational databases and it is very difficult to spot trends and parse the data of the unified record. A supervisor collating the different excel sheets may take many weeks to complete the task.
1. Budget Analysis System Snapshot
2. Budget Analysis System
3. Budget Analysis System projects
4. Products List
5. Summary
6. Upload Sheet
7. Product Infomation
8. Proposed System
The proposed Budget Analysis System will ensure that the excel sheets utilised by the different managers are aligned to the system objectives and follow a uniform structure. This will make it simple for the system to automatically parse the data and generate a unified record. The process can be completed in a matter of seconds and the only possible bottleneck occurs due to a delay on the side of the manager in uploading the excel sheet.
Modules
1. Admin: The admin module will be able to access the excel sheets submitted by the different managers. User accounts for the two levels of access will also be created by the admin. The admin will decide the level of access for each individual user.
2. High level access: The high level access module will be used by upper level management. This module can be used to view the collated data and view trends. Authentication is a very important aspect of this module and login IDs will be recorded because privileged information can be accessed through this module.
3. Low level access: The low level access will be used by the managers to upload the excel sheets required. They will be able to create new projects on the system and generate excel sheets for the same. The admin will grant them access privileges.
SOFTWARE REQUIREMENTS:
FRONT END: ASP.NET
Technologies: C#,
DATABASE: SQL Server,
IIS
Operating System:
Windows XP/7/8/10
HARDWARE REQUIREMENTS:
Processor: Intel
Pentium based system
Processor speed:
250 MHz to 833MHz
RAM SPEED: 1GB
TABLE OF CONTENTS
·
Title
Page
·
Declaration
·
Certification
Page
·
Dedication
·
Acknowledgements
·
Table of
Contents
·
List of
Tables
·
Abstract
CHAPTER SCHEME
CHAPTER ONE: INTRODUCTION
CHAPTER TWO: OBJECTIVES
CHAPTER THREE: PRELIMINARY SYSTEM ANALYSIS
·
Preliminary Investigation
·
Present System in Use
·
Flaws In Present System
·
Need Of New System
·
Feasibility Study
·
Project
Category
CHAPTER FOUR: SOFTWARE ENGINEERING AND PARADIGM APPLIED
·
Modules
·
System / Module Chart
CHAPTER FIVE: SOFTWARE
AND HARDWARE REQUIREMENT
CHAPTER SIX: DETAIL
SYSTEM ANALYSIS
·
Data Flow Diagram
·
Number of modules and Process Logic
·
Data Structures and Tables
·
Entity- Relationship Diagram
·
System Design
·
Form Design
·
Source Code
·
Input Screen and Output Screen
CHAPTER SEVEN: TESTING AND VALIDATION CHECK
CHAPTER EIGHT:
SYSTEM SECURITY MEASURES
CHAPTER NINE:
IMPLEMENTATION, EVALUATION &
MAINTENANCE
CHAPTER TEN:
FUTURE SCOPE OF THE PROJECT
CHAPTER ELEVEN: SUGGESTION AND CONCLUSION
CHAPTER TWELE: BIBLIOGRAPHY& REFERENCES
Other Information
PROJECT
SOFWARE |
ZIP |
PROJECT REPORT PAGE |
60
-80 Pages |
CAN BE USED IN |
Marketing
(MBA) |
PROJECT COST |
1500/-
Only |
PDF SYNOPSIS COST |
250/-
Only |
PPT PROJECT COST |
300/-
Only |
PROJECT WITH SPIRAL BINDING |
1750/-
Only |
PROJECT WITH HARD BINDING |
1850/-
Only |
TOTAL
COST (SYNOPSIS, SOFTCOPY, HARDBOOK, and SOFTWARE, PPT) |
2500/-
Only |
DELIVERY TIME |
1
OR 2 Days (In
case Urgent Call: 8830288685) |
SUPPORT / QUERY |
|
CALL |
8830288685 |
|
help@projectsready.in |
[Note:
We Provide Hard Binding and Spiral Binding only Nagpur Region] |
Comments
Post a Comment
If you have any doubt let me know