Bus Ticket Reservation and Cancelation Technique in jsp
Bus Ticket Reservation and Cancelation Technique in jsp
PROJECT ID: JSP22
PROJECT
NAME: Bus
Ticket Reservation and Cancelation Technique in jsp
PROJECT CATEGORY: MCA / BCA / BCCA / MCM / POLY / ENGINEERING
PROJECT ABSTRACT:
The "Bus Ticket Booking System" has been developed to override the problems prevailing in the practicing manual system. This software is supported to eliminate and in some cases reduce the hardships faced by this existing system. Moreover this system is designed for the particular need of the company to carry out operations in a smooth and effective manner.The application is reduced as much as possible to avoid errors while entering the data. It also provides error message while entering invalid data. No formal knowledge is needed for the user to use this system. Thus by this all it proves it is user-friendly.Bus Ticket Booking System, as described above, can lead to error free, secure, reliable and fast management system. It can assist the user to concentrate on their other activities rather to concentrate on the record keeping.Thus it will help organization in better utilization of resources.Every organization, whether big or small, has challenges to overcome and managing the informations of Ticket, Bus, Customer, Bus Schedule, Bus Route. Every Bus Ticket Booking Systemhas different Busneeds, therefore we design exclusive employee management systems that are adapted to your managerial requirements. This is designed to assist in strategic planning, and will help you ensure that your organization is equipped with the right level of information and details for your future goals. Also, for those busy executive who are always on the go, our systems come with remote access features, which will allow you to manage your workforce anytime, at all times. These systems will ultimately allow you to better manage resources
Existing System And Its Drawbacks:
The earlier system is not computerized. All transactions in the system are done manually maintaining records. To make this laborious job simple the clients have to computerize the system. The management and all the departments that have been carrying out this job using manually makes the job more complicated and tedious most of the times. So, the best way is computerize computerization of the current environment. For example, in the earlier system placement officer has to collect student details for placements. Approving those student details takes lot of time. Placement officer and students have to consult each other directly if any information is needed. If any new company come for placements, placement officer and his staff has to search the student details and they have to find the eligible candidates for that particular company placement. Here searching for eligible candidates takes lots of time. And some times some candidates’ details may be missed.
Drawbacks Of Existing System:
It takes so much time for a placement officer to collect students’ details and approving the details provided by them. Poor communication between students and placement officer, so here intimating about new placements is a hard task. Students may not know about company details. Here also poor communication provides a problem.
Candidate may not get required information if concerned TPO is not at the desk.
Modules:
Modules of Bus Ticket Booking System:
1. Bus Management Module: Used for managing the Bus details.
2. Bus Route Module : Used for managing the details of Bus Route
3. Bus Schedule Module : Used for managing the details of Bus Schedule
4. Ticket Management Module: Used for managing the information and details of the Ticket.
5. Booking Module : Used for managing the Booking details
6. Customer Module : Used for managing the Customer informations
7. Login Module: Used for managing the login details
8. Users Module : Used for managing the users of the system
Technologies Used
1. Java
2. SQL
3. JSP
4. JavaScript
5. Ajax
SOFTWARE REQUIREMENTS:
1. Oracle
2. Jdk
3. Eclipse
4. Netbeans
5. notepad
HARDWARE REQUIREMENTS:
1. Hard Disk – 2 GB.
2. RAM – 1 GB.
3. Processor – Dual Core or Above.
4. Mouse.
5. Keyboard.
6. Monitor.
7. Printer.
TABLE OF CONTENTS
·
Title
Page
·
Declaration
·
Certification
Page
·
Dedication
·
Acknowledgements
·
Table of
Contents
·
List of
Tables
·
Abstract
CHAPTER SCHEME
CHAPTER ONE: INTRODUCTION
CHAPTER TWO: OBJECTIVES
CHAPTER THREE: PRELIMINARY
SYSTEM ANALYSIS
·
Preliminary
Investigation
·
Present System in Use
·
Flaws In Present System
·
Need Of New System
·
Feasibility Study
·
Project Category
CHAPTER FOUR: SOFTWARE
ENGINEERING AND PARADIGM APPLIED
·
Modules
·
System / Module Chart
CHAPTER FIVE: SOFTWARE AND
HARDWARE REQUIREMENT
CHAPTER SIX: DETAIL SYSTEM
ANALYSIS
·
Data Flow Diagram
·
Number of modules and
Process Logic
·
Data Structures and Tables
·
Entity- Relationship
Diagram
·
System Design
·
Form Design
·
Source Code
·
Input Screen and Output
Screen
CHAPTER SEVEN:
TESTING
AND VALIDATION CHECK
CHAPTER EIGHT:
SYSTEM SECURITY MEASURES
CHAPTER NINE:
IMPLEMENTATION, EVALUATION &
MAINTENANCE
CHAPTER TEN:
FUTURE SCOPE OF THE PROJECT
CHAPTER ELEVEN: SUGGESTION AND CONCLUSION
CHAPTER TWELE: BIBLIOGRAPHY& REFERENCES
Other
Information
PROJECT
SOFWARE |
ZIP |
PROJECT REPORT PAGE |
60
-80 Pages |
CAN BE USED IN |
Marketing
(MBA) |
PROJECT COST |
1500/-
Only |
PDF SYNOPSIS COST |
250/-
Only |
PPT PROJECT COST |
300/-
Only |
PROJECT WITH SPIRAL BINDING |
1750/-
Only |
PROJECT WITH HARD BINDING |
1850/-
Only |
TOTAL
COST (SYNOPSIS, SOFTCOPY, HARDBOOK, and SOFTWARE, PPT) |
2500/-
Only |
DELIVERY TIME |
1
OR 2 Days (In
case Urgent Call: 8830288685) |
SUPPORT / QUERY |
|
CALL |
8830288685 |
|
help@projectsready.in |
[Note:
We Provide Hard Binding and Spiral Binding only Nagpur Region] |
Comments
Post a Comment
If you have any doubt let me know