Photo lab management system project in java
Photo lab management system project in java
PROJECT ID: JAVA43
PROJECT NAME: Photo lab management system project in java
PROJECT CATEGORY: MCA / BCA / BCCA / MCM / POLY / ENGINEERING
PROJECT ABSTRACT:
Photo Lab Management System is a computerized system for complete and effective management of photo processing laboratories/labs. With this system, the billing and inventory management in photo studios can be done efficiently to ensure the optimum utilization of available resources, thereby strengthening the productivity levels.
This project is developed using Java programming language and uses Oracle as the database. All the necessary project resources including complete Java source code, project documentation, and paper presentation (ppt) can be downloaded from the link below.
Detailed description regarding database tables (DCL commands, DDL commands, DML commands), requirements, design, coding, testing, and other miscellaneous information can be referred from the project documentation. Presented below is a brief overview of the project.
Photo Lab Management System (PLS or PLMS) is a software project developed for a typical photo studio. It is implemented on a pure Java2EE architecture with Oracle database. Here, all database transactions are done using type 4th driver which is database dependent and is a pure Java driver.
Existing System:
The existing photo lab systems include paper works for almost all the works such as details about customer billing, employee salary, customer details, materials used for photo development, etc. Every records should be entered with pen on a paper which is a very tedious, difficult, and uneconomical task.
Proposed System:
The proposed system can store huge amount of data of customer coming to the photo studio along with the details of employees working and material used in the lab. Data are stored very effectively as the procedure is category-wise.
Suppose, the data is about customer, then it will be stored under “Customers” inventory. Likewise, employee details are stored under “Employees” inventory, and details of materials are stored under “Materials” inventory. Hence, all data are effectively managed in the system database.
System Users:
Administrator: They have complete access to all the parts of the system with roles such as handling, maintaining and managing all the components, users, and modules. They check the status of photo lab on a regular basis.
Data Entry Operator (DEO): This user of the system is responsible for making a detailed analysis of every day details related to customer, employees, and materials. Also, they should update the data regarding billing, salaries, and materials in the system.
Modules Overview:
Log in and registration: This allows admin to log in to the system and register the DEO details. The details are to be entered on Log in and Registration pages.
Customer details: The customer details should be entered carefully by the DEO user-part of the system.
Reports: After logging in to the system, the DEO can generate reports and the administrator can view these daily.
Bills: The bills of customers are to be entered and updated by the DEO.
Materials: Information and details regarding materials are entered and updated by the DEO on a regular basis.
Employees: There are many employees working in the photo studio, whose details, information, and salary records are entered by the admin every month.
SOFTWARE REQUIREMENTS:
FRONT END: HTML, JAVA
SCRIPT
Technologies: CORE
JAVA
DATABASE: SQL
Operating System:
Windows XP/7/8/10
HARDWARE REQUIREMENTS:
Processor: Intel
Pentium based system
Processor speed:
250 MHz to 833MHz
RAM SPEED: 1GB
TABLE OF CONTENTS
·
Title
Page
·
Declaration
·
Certification
Page
·
Dedication
·
Acknowledgements
·
Table of
Contents
·
List of
Tables
· Abstract
CHAPTER SCHEME
CHAPTER ONE: INTRODUCTION
CHAPTER TWO: OBJECTIVES
CHAPTER THREE: PRELIMINARY SYSTEM ANALYSIS
·
Preliminary Investigation
·
Present System in Use
·
Flaws In Present System
·
Need Of New System
·
Feasibility Study
·
Project
Category
CHAPTER FOUR: SOFTWARE ENGINEERING AND PARADIGM APPLIED
·
Modules
·
System / Module Chart
CHAPTER FIVE: SOFTWARE
AND HARDWARE REQUIREMENT
CHAPTER SIX: DETAIL
SYSTEM ANALYSIS
·
Data Flow Diagram
·
Number of modules and Process Logic
·
Data Structures and Tables
·
Entity- Relationship Diagram
·
System Design
·
Form Design
·
Source Code
·
Input Screen and Output Screen
CHAPTER SEVEN: TESTING AND VALIDATION CHECK
CHAPTER EIGHT:
SYSTEM SECURITY MEASURES
CHAPTER NINE:
IMPLEMENTATION, EVALUATION &
MAINTENANCE
CHAPTER TEN:
FUTURE SCOPE OF THE PROJECT
CHAPTER ELEVEN: SUGGESTION AND CONCLUSION
CHAPTER TWELE: BIBLIOGRAPHY& REFERENCES
Other Information
PROJECT
SOFWARE |
ZIP |
PROJECT REPORT PAGE |
60
-80 Pages |
CAN BE USED IN |
Marketing
(MBA) |
PROJECT COST |
1500/-
Only |
PDF SYNOPSIS COST |
250/-
Only |
PPT PROJECT COST |
300/-
Only |
PROJECT WITH SPIRAL BINDING |
1750/-
Only |
PROJECT WITH HARD BINDING |
1850/-
Only |
TOTAL
COST (SYNOPSIS, SOFTCOPY, HARDBOOK, and SOFTWARE, PPT) |
2500/-
Only |
DELIVERY TIME |
1
OR 2 Days (In
case Urgent Call: 8830288685) |
SUPPORT / QUERY |
|
CALL |
8830288685 |
|
help@projectsready.in |
[Note:
We Provide Hard Binding and Spiral Binding only Nagpur Region] |
Comments
Post a Comment
If you have any doubt let me know