Task Manager System project in vb.net
Techno Task Manager System IN VB.NET
PROJECT ID: VBNET38
PROJECT NAME: Techno Task Manager System
PROJECT CATEGORY: MCA / BCA / BCCA / MCM / POLY / ENGINEERING
PROJECT ABSTRACT:
In a company where the hierarchy of employees spans over thousand managing the work with them is a difficult job. And in an environment where number of jobs is done simultaneously picking the right person for the job is also difficult task, as you are not aware of their availability. This application is designed for such an environment where the work is divided into group of employees and during the course of division the employees are selected to be part of the work in hand.
This software being a web based is easily accessible from any corner of the company as every machine is part of a LAN network. The reason why it is made as a web application rather than a window based application if for the same reason.
The complete task is divided into two types of users. Administrator (Highest authority), Manager (working group Community). The activities underlying these sections are as per the company policies.
This application provides most of the features required to manage the tasks developed in a firm.
FUTURE SCOPE OF PROJECT
The application is capable of managing only tasks and their respective allotments where as there is not scope of communication between two groups or between the employees other than mail notification. The information between them is still in terms of documents. The application can improve in these areas of communication and document preservation as well as client maintenance.
The application can be converted into a Mobile based using ASP.net with which the deployment of application will be done only on enterprises server and is accessible to all other departments of the organization. The current application is confined to only one enterprise.
SOFTWARE REQUIREMENTS:
FRONT END: VB..NET,
DATABASE: SQL Server,
IIS
Operating System:
Windows XP/7/8/10
HARDWARE REQUIREMENTS:
Processor: Intel
Pentium based system
Processor speed:
250 MHz to 833MHz
RAM SPEED: 1GB
TABLE OF CONTENTS
·
Title
Page
·
Declaration
·
Certification
Page
·
Dedication
·
Acknowledgements
·
Table of
Contents
·
List of
Tables
· Abstract
CHAPTER SCHEME
CHAPTER ONE: INTRODUCTION
CHAPTER TWO: OBJECTIVES
CHAPTER THREE: PRELIMINARY SYSTEM ANALYSIS
·
Preliminary Investigation
·
Present System in Use
·
Flaws In Present System
·
Need Of New System
·
Feasibility Study
·
Project
Category
CHAPTER FOUR: SOFTWARE ENGINEERING AND PARADIGM APPLIED
·
Modules
·
System / Module Chart
CHAPTER FIVE: SOFTWARE
AND HARDWARE REQUIREMENT
CHAPTER SIX: DETAIL
SYSTEM ANALYSIS
·
Data Flow Diagram
·
Number of modules and Process Logic
·
Data Structures and Tables
·
Entity- Relationship Diagram
·
System Design
·
Form Design
·
Source Code
·
Input Screen and Output Screen
CHAPTER SEVEN: TESTING AND VALIDATION CHECK
CHAPTER EIGHT:
SYSTEM SECURITY MEASURES
CHAPTER NINE:
IMPLEMENTATION, EVALUATION &
MAINTENANCE
CHAPTER TEN:
FUTURE SCOPE OF THE PROJECT
CHAPTER ELEVEN: SUGGESTION AND CONCLUSION
CHAPTER TWELE: BIBLIOGRAPHY& REFERENCES
Other Information
PROJECT
SOFWARE |
ZIP |
PROJECT REPORT PAGE |
60
-80 Pages |
CAN BE USED IN |
Marketing
(MBA) |
PROJECT COST |
1500/-
Only |
PDF SYNOPSIS COST |
250/-
Only |
PPT PROJECT COST |
300/-
Only |
PROJECT WITH SPIRAL BINDING |
1750/-
Only |
PROJECT WITH HARD BINDING |
1850/-
Only |
TOTAL
COST (SYNOPSIS, SOFTCOPY, HARDBOOK, and SOFTWARE, PPT) |
2500/-
Only |
DELIVERY TIME |
1
OR 2 Days (In
case Urgent Call: 8830288685) |
SUPPORT / QUERY |
|
CALL |
8830288685 |
|
help@projectsready.in |
[Note:
We Provide Hard Binding and Spiral Binding only Nagpur Region] |
Comments
Post a Comment
If you have any doubt let me know